OUR WORK
GOLD MILL BUILDING PROJECT
- Provided project and construction management
- Provided site safety of project and site facilities
- Managed all scheduling, cost control and purchasing
- Blasted out 30,000 metric tons of rock which included all required excavation
- Place 80,000 metric tons of backfill which was crushed and screened onsite
- Drilled and installed all required rock dowels for rebar matts
- Poured over 2,000 cu. M of cast in place concrete
- Supplied and installed the 80,000 square feet mill building
AGGREGATE CRUSHING, SCREENING AND WASHING PLANT INSTALLATION
- Provided project and construction management
- Provided site safety of project and site facilities
- Managed all scheduling, cost control and purchasing
- Supplied and installed 750 metric tons of structural steel
- Supplied all mechanical infrastructure including conveyors, crushers and screens
- Poured 150 cu. M of cast in place concrete for reclaim system
- Installed wash plant system which included a fines recovery system
- Provided all commissioning for start up of infrastructure
LIMESTONE CRUSHING AND SCREENING PLANT PROJECT
- Provided project and construction management
- Managed all scheduling, cost control and purchasing
- Provided detailed groundwork and concrete footing requirements
- Supplied and installed all structural steel
- Supplied and installed all mechanical infrastructure including conveyors, crushers and screens
Granite crushing and Screening Project
- Project and construction management
- Cost control, scheduling and purchasing
- Detailed groundwork and concrete footings
- Supply and install of structural steel
- Supply and install of all mechanical including conveyors, crushers, and screens
RAISE REHABILITATION AND MANWAY INSTALLATION PROJECT
- Installed all required ground support and screen for a 160ft raise
- Installed all steel infrastructure for manway system included ladders and platforms
- Installation of steel approach landing
- Installation of concrete exit pad
- Application of 11.7 cu. M of shotcrete at throat of raise
UNDERGROUND CIVIL SWITCHROOM BUILD PROJECT
- Applied over 13.5 cu. M of shotcrete
- Formed and poured concrete floor
- Formed, poured and installed a water catch basin system to catch and divert water for a leaking wall
UNDERGROUND CONVEYOR TRANSFER POINT PROJECT
- Removed old steel floor and beams
- Installed new steel beams and steel platform
- Repaired conveyor
MUCK CIRCUIT INSTALLATION PROJECT
- Shrunk bin
- Installation of scaffolding inside bin
- Removed worn out liners
- Repaired Nut Boxes
- Installed new liners
UNDERGROUND PIPE AND THRUST BRACKET INSTALLATION PROJECT
- Project involved the anchoring of brackets
- Forming and pouring of concrete bracket support
- Installation of pipe
- Commissioning and testing of piping system
CIVIL SERVICES
- Excavation, earthworks and demolition
- Cast-in-place concrete
- Machinery foundations
- Concrete slip form construction
- Wood framing & sheathing
- Dams: earth, controlling, power generation and breakwaters
- Grouting (injection and standard)
- Site services (well and sewer lines)
- Office and interior commercial and institutional construction and renovations
Custom Concrete
Slip Formed Concrete LightHouse / Observation Tower in Northern Ontario.
The project was brought in on time during a winter construction period with restrictive plumbness tolerances being met through rigorous quality assurance.
Custom designed cast in place concrete pool.
Tower and pool contained over 2,900 cu. M. of concrete.
HYDRO Station
Completed all formwork for the installation of a new turbine at the Dokis Power Generating Station.
Dam Repairs
- Deck rehabilitation at the Coniston DAM
- Leaking dam wall repair where we plugged and injected grout to repair leaks in wall
Berthing Dolphin
Design build of access trestle and berthing dolphin for Laker sized vessels. Project included all site work, marine construction, pile driving, and concrete. A custom concrete cooling system was installed to allow for a high early strength mix to minimize port down time.
Pump Base Replacement
Cast Construction self performs all aspects of machinery foundation removals, retrofits and new construction including this pump base at Strathcona Mill.
Sag, Rod and Ball Mill MTCE
New Installation, Repairs, Retrofits and Replacements of SAG Rod and Ball Mills.
Cone crusher rebuild
Refurbishment and the Addition of a Hydraulic Tamp Iron System on a cone Crusher at Clarabelle Mill.
Jaw crusher rebuild
After the steel had reached a point of failure shortly after being commissioned, Cast was hired to completely rebuild the two 54×60” Jaw Crusher support structures
- New concrete foundations were installed
- New Support Steel was installed
- Repaired the rock hammer tower
- Increased the dump box capacity
- Reworked all the skirting, feeders, control gates
- Install new control room supports
Transfer Point Replacements
Demolition of 100MT of existing chute work and replacement of all support steel, access platforms and chute work during a 14-day shut down on the primary transfer tower at the largest coal port on the west coast.
Demolition of 100 metric tons of structured steel from existing chute work. Scope also included replacement of drive, gravity take up, tripper discharge system and settling and impact zones.
Gyratory Crusher Dump Hopper Rework
Scope included concrete floor repairs, installation of new floor liners and wear shoes and the supply and installation of a new crusher outlet chute.
Ore Assay Sampling System
Design build of two Ore Sampling Systems in Northern Ontario. The systems included three stage sampling, one stage of reduction and all related foundations, supports and materials handling equipment.